We estimate the social cost of eliminating energy outages in Chile's Central Interconnected System (SIC) with the hydrotermic dispatch model used to operate the system.We simulate the optimal operation with 1,000 random hydrology se-quences, and compute the maximum projected deficit, say X. We then estimate the additional permanent capacity needed to eliminate X.
Our main conclusion is that much more than X MW are needed, and the cost is significant. For example, despite that reservoirs had plenty of water in October 2001, 685 MW of additional permanent capacity (equivalent to 11% of currently installed capacity) would have been needed to eliminate a 275 MW projected deficit, at a cost of nearly US$ 260.9 million. After a draught, 850 MW would be needed, at a cost of US$ 298.7 million.
How to Cite
Galetovic, A., Olmedo, J. C., & Soto, H. (1). Una Estimación del Costo Social de Eliminar los Déficit de Abastecimiento Eléctrico en el SIC. Economic Analysis Review, 17(2), 3-30. Retrieved from https://www.rae-ear.org/index.php/rae/article/view/17
Issue
Section
Articles
Upon submission of an article, authors are asked to indicate their agreement to abide by an open-access license. The license permits any user to download, print out, extract, archive, and distribute the article, so long as appropriate credit is given to the authors of the work. The license ensures that your article will be as widely available as possible and that your article can be included in any scientific archive. Please read about the Creative Commons Attribution License before submitting your paper.
Except where otherwise noted, content on this site is licensed under a Creative Commons Attribution 3.0 License