Renegotiating Incomplete Contracts: Over and Under-Investment in Public Infrastructure Franchising

Authors

  • Eduardo Saavedra ILADES/Georgetown University and Cornell University

Keywords:

incomplete contracts, renegotiation, infrastructure franchising, over-investment, under-investment, service quality

Abstract

This paper characterizes the equilibria of infrastructure franchising under incomplete contracting and ex-post renegotiation. The parties (government and a firm) are unable to credibly commit to the contracted investment plan, so that a second step investment (labeled as investments in service quality) is renegotiated by the parties in the revision stage. As expected, the possibility of renegotiation affects initial non-verifiable investments. The main conclusion of this paper is that not only under-investment but also over-investment in infrastructure may arise in equilibrium, compared to the complete contracting level.

Downloads

Download data is not yet available.

References

Aghion, P., Dewatripont, M., & Rey, P. (1994). Renegotiation design with unverifiable information. Econometrica, 62(2), 257–282. https://doi.org/10.2307/2951613

Allen, F., & Gale, D. (1992). Measurement distortion and missing contingencies in optimal contracts. Economic Theory, 2(1), 1–26. https://doi.org/10.1007/bf01213250

Anderlini, L., & Felli, L. (1994). Incomplete written contracts: Undescribable states of nature. Quarterly Journal of Economics, 109(4), 1085–1124.

Armstrong, M., Cowan, S., & Vickers, J. (1994). Regulatory reform: Economic analysis and British experience. MIT Press.

Bernheim, B. D., & Whinston, M. (1997). Incomplete contracts and strategic ambiguity (Discussion Paper Series). Harvard University.

Besanko, D., & Spulber, D. (1992). Sequential-equilibrium investment by regulated firms. RAND Journal of Economics, 23(2), 153–170. https://doi.org/10.2307/2555981

Bitran, E., & Saavedra, E. (1993). Promoción de la competencia y regulación de monopolios naturales. In E. Lahera (Ed.), Cómo mejorar la gestión pública. CIEPLAN.

Bolton, P. (1990). Renegotiation and the dynamics of contract design. European Economic Review, 34(2-3), 303–310. https://doi.org/10.1016/0014-2921(90)90102-5

Bös, D., & Lülfesmann, C. (1996). The hold-up effect problem in government contracting. Scandinavian Journal of Economics, 98(1), 53–74. https://doi.org/10.2307/3440580

Chung, T. Y. (1991). Incomplete contracts, specific investments, and risk sharing. Review of Economic Studies, 58(5), 1031–1042. https://doi.org/10.2307/2297950

Grossman, S., & Hart, O. (1983). An analysis of the principal-agent problem. Econometrica, 51(1), 7–45. https://doi.org/10.2307/1912246

Grossman, S., & Hart, O. (1986). The cost and benefit of ownership: A theory of vertical and lateral integration. Journal of Political Economy, 94(4), 691–719.

Hart, O., & Holmström, B. (1987). The theory of contracts. In T. F. Bewley (Ed.), Advances in economic theory, Fifth World Congress. Cambridge University Press. https://doi.org/10.1017/ccol0521340446.003

Hart, O., & Moore, J. (1988). Incomplete contracting and renegotiation. Econometrica, 56(4), 755–785.

Holmström, B., & Milgrom, P. (1991). Multi-task principal agent problems: Incentive contracts, asset ownership and job design. Journal of Law, Economics and Organization, 7(Número especial), 24–52.

Khan, A. (1988). The economics of regulation: Principles and institutions. MIT Press.

Klein, B., Crawford, R., & Alchian, A. (1978). Vertical integration, appropriable rents, and the competitive contracting process. Journal of Law and Economics, 21(2), 297–326. https://doi.org/10.1086/466922

Laffont, J. J., & Tirole, J. (1993). A theory of incentives in procurement and regulation. MIT Press.

Maskin, E., & Tirole, J. (1997). Unforeseen contingencies, property rights, and incomplete contracts [Mimeo].

Muñoz, O. (1993). Después de las privatizaciones: Hacia un Estado regulador. CIEPLAN.

Noldeke, G., & Schmidt, K. (1995). Option contracts and renegotiation: A solution to the hold-up problem. RAND Journal of Economics, 26(2), 163–179. https://doi.org/10.2307/2555911

Spier, K. (1992). Incomplete contracts and signaling. RAND Journal of Economics, 23(3), 432–443.

Tirole, J. (1986). Procurement and renegotiation. Journal of Political Economy, 94(2), 235–259. https://doi.org/10.1086/261372

Tirole, J. (1988). A theory of industrial organization. MIT Press.

Tirole, J. (1994). The internal organization of government. Oxford Economic Papers, 46(1), 1–27. https://doi.org/10.1093/oxfordjournals.oep.a042114

Vickers, J., & Yarrow, G. (1988). Privatization: An economic analysis. MIT Press.

Williamson, O. (1975). Market and hierarchies: Analysis and antitrust implications. Free Press.

Williamson, O. (1985). The economic institutions of capitalism. Free Press.

Downloads

Published

1998-04-30

How to Cite

Saavedra, E. (1998). Renegotiating Incomplete Contracts: Over and Under-Investment in Public Infrastructure Franchising. Economic Analysis Review, 13(1), 149–179. Retrieved from https://www.rae-ear.org/index.php/rae/article/view/125

Issue

Section

Articles

Article usage

ViewsTimes this article's page was opened since the journal started recording statistics. One person can visit more than once.
152
DownloadsTimes the full text of this article (usually the PDF) was opened or downloaded.
198

All time, as recorded by the journal.

Among the top 25% by views · last 2 yearsCompared with all the journal's articles by views in the last 2 years, this one is among the top 25%.

Last 2 years: 85 views, 112 downloads.

1.30 downloads per view (journal average 1.66).Downloads of the full text for every abstract view of this article, compared with the whole journal.

Explore the journal's metrics